Construction Division

Information, Memos, & Letters | Construction Management | Online Forms | Resources | Email Us


DESIGN PHASE SUPPORT:  

Specifications  |  Value Engineering


PROCUREMENT PHASE:

Advertisement  |  Bid Letting |  Bid Tabulations  |  Document Sales  |  Emergency Contracts  |  Prequalification 

Local Administered Projects  |  *Streaming Video Link for Construction Division Bid Lettings*


CONSTRUCTION PHASE SUPPORT:  

Construction Engineering and Inspection  |   Construction Quality Improvement Program

Construction Risk Management  |  Construction Scheduling
 

 

Kerry A. Bates, P.E.
State Construction Engineer
 
Greg Henion, P.E.
Deputy State Construction Engineer


 

Don Silies, VCCO
- Construction &
  Maintenance
  Contracting
- Bid Documents
- Contract Documents
- Emergency Contracts
- Estimating
Dennis Motley, CCM
- Performance Measurements
- Federal Authorizations
- Prequalification
- Division Business
  Administration
- Contractor Document Sales
Patrick O'Leary, P. E.
- Specifications
- Contract Closeout & Final
  Records
- Construction Engineering
  System Support
- Claims
Ian Millikan, P.E.
- Construction Management
- Contract Administration
- Project Controls
- Scheduling
- Construction Risk
  Management
- Value Engineering

 

phoneConstruction Division Directory

 


Announcements

  • Important Notice to all bidders regarding Davis/Bacon Wages

    New wage decisions were issued on January 6, 2017. Federal law requires that if new wage decisions are issued 10 days before receipt of bids, all contracts shall include the new decisions. Therefore for any bids due January 25, 2017 and thereafter, the January 6, 2017 wages shall apply. Fortunately the trade rates did not change but there are several changes to the notes, so please read these carefully. Because of the timing, we will not be sending addendums for these wage decisions. Please use this link http://www.virginiadot.org/business/const/wage-rates.asp to the VDOT wage decisions. Select the county where the work occurs. Please use this when preparing your bid. The final contracts will include the new wage decisions.
     

  • L60 - Rideability Special Provisions 2/21/2017
  • L57 - Soil Borings Report 2/13/2017
  • L59 - Traffic Study 2/3/2017
  • L53 - As Built Drawings - Part 1   Part 2   (1/17/2017)
  • IMPORTANT NOTICE REGARDING PAPER ADDENDUMS - 7/28/16
  • If you are experiencing difficulty in download electronic plans/proposals from the Falcon website via our CABB system, it could be due to the software JAVA.  Please select and download the following two links to assist in this issue:  JAVA 8 Configuration Instructions | The Johnathan Group File [zipped file]  (5/4/16)
  • Asphalt Plant Mix Schedules (2016 Season)
    Please disregard any reference in Section 315 to tack being an included item.   All tack will be paid for the contract unit price.
  • Volume II Plant Mix 2016 - 12/16/15
  • Volume II Surface Treatment 2016
  • Asphalt Material Price Adjustment  1/12/15
  • Asphalt Material Price Adjustment - Vol.2 - Amendments. (SPCN) 1/12/15
  • S315R00 - Rideability (Asphalt) - 1/13/15
  • Public Notification of Parking Restrictions SPCN Templates

Calendar

JAN  |  FEB  |  MAR  |  APR  |  MAY  |  JUN  |  JUL  |  AUG  |  SEP  |  OCT  |  NOV  |  DEC  |  PREQUALIFICATION

 

Mission - Values

 

 

Page last modified: Feb. 21, 2017