Upcoming Professional Services Contract Opportunities
Professional services consultant program information
(Within the next 6 to 12 months)
Click on a division below for upcoming consultant contracts/advertisements:
- Environmental
- Alternate Project Delivery
- Location and Design
- Operations & Security Division
- Materials
- Transportation and Mobility Planning
- Right of Way/Utilities
- Construction Division
- Structure and Bridge
- Traffic Engineering
Information related to VDOT’s Consultant Engineering Outsourcing Planning document can be found on the following VDOT Consultant Procurement web page. http://www.vdot.virginia.gov/business/gpmps.asp
Environmental
None at this time
Alternate Project Delivery Office and Transportation P3 Office
None at this time
Location and Design
Proj: 0395-029-015, P101 UPC 103316
Add 4th through lane SB I-395 from Duke St to Edsall Rd
- Anticipated Construction Cost – None programmed, PE only
- Anticipated Advertisement – Spring 2013
Proj: 0029-030-121, P101 UPC 77384
Design new interchange at the intersection of Routes 15/17/29
- Estimated Construction Cost - $26 M
- Anticipated Advertisement – Spring 2013
Operations and Security Division
None at this time
Materials
None at this time
Transportation and Mobility Planning
Statewide and Metropolitan Travel Demand Modeling On-Call- May be multiple award, one 2 year term, with the option to renew for two additional 1 year terms
- Anticipated Cost: Maximum fee per term- $2,000,000
- Anticipated Advertisement Date—May 2013
Right of Way and Utilities
None at this time
Construction Division
None at this time
Structure and Bridge
Safety Inspections of Bridges and Structures Limited Services Term Contract
NOVA District - One 2 year term, with the option to renew for two additional 1 year terms
- Maximum fee per term - $4,000,000
- Anticipated Advertisement Date – July 2013
Safety Inspections of Bridges and Structures Limited Services Term Contract
Salem District - One 2 year term, with the option to renew for two additional 1 year terms
- Maximum fee per term – To be determined
- Anticipated Advertisement Date – January 2014
Maintenance & Rehabilitation Design Limited Services Term Contract
Region I (Bristol, Salem Districts) - One 2 year term, with the option to renew for two additional 1 year terms
- Maximum fee per term – To be determined
- Anticipated Advertisement Date – January 2014
Maintenance & Rehabilitation Design Limited Services Term Contract
Region III (Fredericksburg, Richmond, HR Districts) - One 2 year term, with the option to renew for two additional 1 year terms
- Maximum fee per term – To be determined
- Anticipated Advertisement Date – February 2014
New Bridge Design Limited Services Term Contract
Statewide - One 2 year term, with the option to renew for two additional 1 year terms
- Maximum fee per term – To be determined
- Anticipated Advertisement Date – March 2014
Traffic Engineering
None at this time
