RELEASE:

CONTACT:
IMMEDIATE

Stacy Londrey 540-727-3201
Stacy.Londrey@vdot.virginia.gov

Will Merritt 540-829-7370
William.Merritt@vdot.virginia.gov

CULP 2017-019

Jan. 19, 2017



RT. 795 BRIDGE TO CLOSE FOR REHABILITATION JAN. 23
Once complete, bridge weight restriction will be removed

CULPEPER — Beginning Jan. 23, the Virginia Department of Transportation will close the Route 795 (Blenheim Road) bridge over Hardware River in Albemarle County.

The bridge, located 2.7 miles south of Route 708 (Secretarys Road), will be closed through substantial completion of the project on or before the Oct. 30 contracted end date.

Southbound drivers should travel east on Route 708 to Route 618 (Jefferson Mill Road), which carries traffic back to Route 795. Northbound motorists will reverse the detour. Driveway access will be maintained for local traffic.

The existing Hardware River bridge was built in 1907 and carries approximately 180 vehicles daily, according to a 2015 traffic count.

Under a $746,846 construction contract, Virginia Department of Transportation contractor Fairfield-Echols, LLC of Fishersville will replace the current timber deck truss structure in kind. After construction, the posted 3-ton weight restriction will be removed and the bridge will be open to all legal-weight vehicles.

Message boards are in place to notify the public of the closure.

For more information about Virginia’s bridges and VDOT’s bridge inspection program, including current conditions of the state’s bridges, FAQs and video of a bridge inspection, visit www.virginiadot.org/info/Bridge.asp.

 (END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Jan. 19, 2017