RELEASE:

CONTACT:
IMMEDIATE

Paula K. Jones 434-856-8176
Paula.Jones@vdot.virginia.gov

LYN-17-080

July 21, 2017



US 460/29 ACCESS MANAGEMENT PROJECT NEARING COMPLETION

LYNCHBURG, Va. — Phase Two of the U.S. 460/29 Access Management project in Lynchburg is nearing completion.

The 55 mph speed limit between Concord Turnpike and U.S. 501 has been restored and the reduced speed limit signs removed. A 45 mph speed limit remains in effect from U.S. 501 to near Candler’s Mountain Road, through the Odd Fellows Road interchange and connector project.

Message boards and other traffic control devices will alert motorists to those changes and delays should be expected.

Current traffic information will be available by calling 511 or online at www.511virginia.org.



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: July 21, 2017