RELEASE:

CONTACT:
IMMEDIATE

Mike Murphy 703-259-1757
703-638-8547 michael.murphy@vdot.virginia.gov
NR17-101

Aug. 8, 2017



Mary Baldwin Drive Closed Through End of August
Detour in place during pipe replacement


GROVETON – Mary Baldwin Drive between University Drive and Smithway Drive is closed to all traffic through Thursday, August 31 for stormwater pipe replacement, according to the Virginia Department of Transportation.

Traffic is being detoured via Mary Baldwin Drive, Memorial Street, Route 1, Beacon Hill Road and Smithway Drive back to Mary Baldwin Drive.

All work is weather permitting.

Follow VDOT Northern Virginia on Twitter: @vadotnova

                                                                                              END



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Aug. 8, 2017