STAUNTON – The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton district consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley:  Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.

Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures. 

(NEW) or (UPDATE) indicates a new entry or a revised entry since last week’s report. 

 

ALLEGHANY COUNTY 

INTERSTATE 64

(NEW) Mile marker 5.3 to 4.7 westbound – Right lane and right shoulder closures for pavement repairs. December 7, 8 a.m. – 2 p.m. 

PRIMARY ROADS

Various roads – Mowing and shoulder repairs at various locations with mobile work zones. Monday - Friday, 8:30 a.m. - 4 p.m. 

SECONDARY ROADS

Route 696 (Selma-Low Moor Road) – Occasional flagging operations as needed near Route 1101 (Winterberry Avenue) and I-64 for intersection improvements. Estimated project completion summer 2018.

Various roads – Pipe replacement and slope repairs with flagger traffic control. Mowing and patching with mobile work zones. Monday - Friday, 8:30 a.m. - 4 p.m. 

 

BATH COUNTY

PRIMARY ROADS

No lane closures reported. 

SECONDARY ROADS

Various roads – Mowing and pavement patching at various locations with mobile work zones. Flagger-controlled traffic for ditching at various locations. Monday - Friday, 8:30 a.m. - 4 p.m. 

 

ROCKBRIDGE COUNTY  

INTERSTATE 64

(NEW) Mile marker 41 to 57, eastbound and westbound – Right shoulder closures for median and shoulder brush cutting and mowing. December 6-16, 7 a.m. to 6 p.m. 

(UPDATE) Mile marker 54 to 55, eastbound – Watch for vehicles entering and leaving median during geophysical testing through December 10, 7 a.m. to 5 p.m. 

INTERSTATE 81

(UPDATE) Mile marker 174 to 206, northbound and southbound – Left or right shoulder closures for brush cutting and mowing. Through December 9, 7 a.m. to 6 p.m. 

PRIMARY ROADS

Route 60 (Midland Trail) – Alternating lane closures for bridge work on I-81 overpass bridges between Route F-879 (Bares Woods Lane) and Route 819 (Robin Lane). Through December 22, 7 a.m. - 5 p.m.

(UPDATE) Various roads – Flagger traffic control for ditching, brush cutting, shoulder repairs and pipe replacement. Monday - Friday, 8:30 a.m. - 4 p.m. 

SECONDARY ROADS

(NEW) Route 622 (Whiteside Road) – Road closed December 11-15 for replacement of low-water bridge over Alone Mill Creek. Work zone between Route 602 (Turkey Hill Road) and Route 624 (Maple Swamp Road). 

Route 850 (West Midland Trail) – Signal-controlled traffic through December 8 for bridge replacement at Brattons Run just east of Route 780 (Brattons Run Road).

(UPDATE) Various roads – Flagger traffic control for ditching, brush cutting, shoulder repairs and piper repairs. Monday - Friday, 8:30 a.m. - 4 p.m. 

 

HIGHLAND COUNTY  

PRIMARY ROADS

No lane closures reported. 

SECONDARY ROADS

(UPDATE) Various roads – Flagger traffic control for ditching, brush cutting, tree trimming and pothole repairs. Monday - Friday, 8:30 a.m. - 4 p.m.

 

AUGUSTA COUNTY 

INTERSTATE 64

No lane closures reported. 

INTERSTATE 81

(NEW) Mile marker 207.5 to 208.1, northbound – Overnight right lane closure for pavement repairs from 8 p.m. December 5 to 1 a.m. December 6.

(UPDATE) Mile marker 212 to 214, northbound and southbound – Overnight left lane closures December 4 -7, 8 p.m. to 7 a.m., for exit 213 interchange improvements. Shoulder closures possible 24/7.  Estimated project completion March 2018.

Mile marker 228 to 229, northbound and southbound – Overnight, alternating lane closures for bridge work over Middle River, 8 p.m. - 7 a.m. through December 8.

(NEW) Mile marker 234.6  to 235, northbound – Right shoulder closure for underground fiber installation December 5-6, 7 a.m. – 4:30 p.m. Brief “slow roll” closures December 10 between 10 a.m. and 11 a.m. to extend utility lines over I-81 travel lanes.

(NEW) Mile marker 236 to 238.5, northbound and southbound – Overnight alternating lane closures for inspection of Naked Creek bridges from 8 p.m. December 5 to 4:30 a.m. December 6.

(NEW) Mile marker 236.5 to 237, northbound – Right shoulder closures for shoulder work. December 5, 8 a.m. - 4 p.m. 

PRIMARY ROADS

(UPDATE) Route 250 (Three Notched Mountain Highway, Afton) Right shoulder closures for bridge work at I-64, Monday to Thursday from 6:30 a.m. - 5:30 p.m. through December 7. 

SECONDARY ROADS

Route 610 (Howardsville Turnpike) – Road closed to through traffic 24/7 Monday to Friday between Route 912 (Hodge Street) and Route 660 (Lake Road) for roadway and utility work. Route 912 and Route 660 will serve as detour routes through spring 2018. Residents and school buses will have access to Route 610 with flagger traffic control.

(NEW) Route 708 (Glebe School Road)“Stop and Proceed” traffic pattern 24/7 during bridge repairs over Edison Creek, December 11- 22.  

 

ROCKINGHAM COUNTY  

INTERSTATE 81

(NEW) Mile marker 245.8 to 246, northbound and southbound – Overnight alternating lane closures for inspection of Route 253 (Port Republic Road) overpass bridge, 8 p.m. December 6 to 5 a.m. December 7.

(NEW) Mile marker 246 to 250 – Mobile, nighttime, alternating lane closures for inspection of Route 720 (Old Furnace Road) overpass bridge. 8 p.m. December 3 to 2 a.m. December 4. 

PRIMARY ROADS

(UPDATE) Route 11 – Intermittent mobile, alternating lane closures for utility work from Route 257 (Dinkle Avenue) to Route 704 (Oakwood Drive). December 4-8, 9 a.m. - 5 p.m.

(UPDATE) Route 11 (Valley Pike) – Flagger-controlled lane closures from Harrisonburg northern city limit to I-81 ramps (near Route 259) for guardrail installation, through December 13, 7 a.m. – 7 p.m.

(UPDATE) Route 257 (Ottobine Road) Signal-controlled single-lane traffic during bridge reconstruction. Traffic switch to portion of new bridge over Dry Run tentatively scheduled for December 6. Vehicles limited to 13 feet in width. Estimated project completion December 2018. 

SECONDARY ROADS

Route 614 (Mechanicsville Road) – “Stop and Proceed” traffic pattern from Route 881 to Route 791 for bridge replacement at Honey Run. Through December 29. Work zone active daily from 7 a.m. - 3 p.m.

(NEW) Route 721 (Longs Pump Road) – Flagger-controlled lane and shoulder closures as needed for pavement marking from Route 753 (Kratzer Road) to Route 11 (North Valley Pike). Through December 9 from 7 a.m. - 6 p.m.

(UPDATE) Route 738 (Dry River Road, Bridgewater area) –Road closed to all traffic (including pedestrians and bicycles) south of Route 257 during bridge and intersection construction. Follow posted Route 737 (Cannery Woods Drive) detour back to Route 257. Route 257 traffic will have a width restriction of 13 feet and be reduced to one, signal-controlled travel lane. Estimated project completion December 2018.

(UPDATE) Route 867 (North River Road, Mount Crawford area) – Road closed between Route 11 (South Main Street) and Route 693 (Fairview Road) for repairs to bridge over Pleasant Run. Detour route posted. Estimated completion December 8.

 

PAGE COUNTY 

PRIMARY ROADS

(UPDATE) Route 340 (Page/Rockingham County line) – Line painting December 1- 8 , 7 a.m. - 7 p.m. 

SECONDARY ROADS

(UPDATE) Route 615 (Egypt Bend Road) – “Stop and Proceed” traffic pattern 24/7 during bridge repairs just north of Route 211 intersection. Vehicle widths restricted to 11 feet. Through December 6.

(UPDATE) Route 615 (Serenity Ridge Road) – Intermittent lane closures with flagging operations for Rural Rustic road project from Route 675 (Fort Valley Road) to dead end, 7 a.m. - 4:30 p.m. Through April 30, 2018. 

 

SHENANDOAH COUNTY  

INTERSTATE 81

No lane closures reported. 

PRIMARY ROADS

Route 11(Old Valley Pike, Mt Jackson) – Alternating lane closures from Route 720 (Wissler Road) to Route 743 (Shenandoah Street) for bridge work over North Fork Shenandoah River.  Through December 22, 7 a.m. - 5 p.m.

Route 11 – Cedar Creek Bridge replacement between Route 629 (Oranda Road) in Shenandoah County and Route 840 (Water Plant Road) in Warren County. Traffic restricted to one lane in each direction and a width restriction of 10 feet 6 inches.  Northbound traffic follows median crossovers to use southbound bridge. Work zone speed limit 35 miles an hour. Estimated project completion fall 2018.

(UPDATE) Route 42 (Senedo Road) – Flagger-controlled traffic for line painting from Route 841 (Grover Road) to Route 682 (Lambert Drive). December 1-8, 6 a.m. - 6 p.m. 

SECONDARY ROADS

Route 675 (Stoney Creek Road) – Road closed for bridge replacement at Stoney Creek. Work zone in Columbia Furnace area, about five miles north of Edinburg and 0.33-mile south of Route 42 (Senedo Road). Follow posted detours. Estimated completion spring 2018.

Route 720 (Wissler Road), near Mount Jackson – Closed to through traffic just west of Route 11 for repairs to Meems Bottom covered bridge.

Various roads – Utility tree trimming. Flagger-controlled lane closures as needed. Daylight hours Monday – Friday. 

 

FREDERICK COUNTY 

INTERSTATE 81

No lane closures reported. 

PRIMARY ROADS

No lane closures reported. 

SECONDARY ROADS

Various roads – Utility tree trimming. Flagger-controlled lane closures as needed. Daylight hours Monday – Friday. 

 

CLARKE COUNTY 

PRIMARY ROADS

(UPDATE) Route 340 (Lord Fairfax Highway) – Overnight right shoulder closures for equipment repairs in area of Route 623 (Gaylord Lane). December 4-8, 10 p.m. - 5 a.m. 

SECONDARY ROADS

Various roads – Utility tree trimming.  Flagger-controlled lane closures as needed. Daylight hours Monday - Friday. 

 

WARREN COUNTY  

INTERSTATE 66

No lane closures reported.

INTERSTATE 81

No lane closures reported. 

PRIMARY ROADS

Route 11 – Cedar Creek Bridge replacement between Route 840 (Water Plant Road) in Warren County and Route 629 (Oranda Road) in Shenandoah County. Traffic restricted to one lane in each direction and a width restriction of 10 feet 6 inches.  Northbound traffic follows median crossovers to use southbound bridge. Work zone speed limit 35 miles an hour.

Route 55 (West Strasburg Road, Front Royal) – Traffic pattern change for opening of Quadrant Roadway Intersection just north of Front Royal. Eastbound drivers will use Quadrant Road to turn left onto northbound Route 340/522. Expect delays for paving and line painting on weekdays from 9 a.m. to 3 p.m. Estimated project completion mid-December 2017.

(UPDATE) Route 340/522 (Shenandoah Avenue, Front Royal) – Significant congestion expected from 9 a.m. to 3 p.m. Monday to Friday (December 4-8) for final paving and line marking applications between South Fork bridge and Duck Street. Motorists should consider using John Marshall Highway (Route 55 East) between Interstate 66 and Front Royal. Also, traffic pattern changes at Quadrant Roadway Intersection (QRI) with Route 55 (West Strasburg Road). Be alert for new signs and traffic signals. Estimated project completion mid-December 2017.

SECONDARY ROADS

Route 624 (Morgan Ford Road) – Road closed for bridge replacement over the Shenandoah River. Work zone from Route 643 (Howellsville Road) to Route 661 (Fairground Road). Detours: Drivers south of the bridge will turn right on Route 643 (Howellsville Road), which changes to Route 603 and then to Route 638 in Clarke County. Drivers will then turn left on Route 17/50 (John Mosby Highway) and left on Route 624 (Red Gate Road/Milldale Road) to reach the end of the detour. Drivers north of the bridge will follow Route 624 north and turn right on Route 17/50 in Clarke County. Drivers will then turn right on Route 638 (Howellsville Road), which changes to Route 603 and then Route 643, to reach the end of the detour.  Estimated project completion June 2018.

(NEW) Various roads – Brush cutting and shoulder repairs.

Various roads – Utility tree trimming. Flagger-controlled lane closures as needed. Daylight hours Monday - Friday. 

Vegetation management may take place district wide on various routes. Motorists are reminded to use extreme caution when traveling through work zones. 

Traffic alerts and traveler information can be obtained by dialing 511. Traffic alerts and traveler information also are available at http://www.511Virginia.org

The VDOT Customer Service Center can assist with reporting road hazards, asking transportation questions, or getting information related to Virginia’s roads. Call 800-FOR- ROAD (800-367-7623) or use its mobile friendly website at https://my.vdot.virginia.gov/. Agents are available 24 hours-a-day, seven days a week. 

The Staunton District Twitter feed is at @VaDOTStaunton. VDOT can be followed on Facebook, Flickr, Twitter and YouTube. RSS feeds are also available for statewide information. The VDOT Web page is located at http://www.VirginiaDOT.org.  

The VDOT Staunton District serves Frederick, Shenandoah, Clarke, Warren, Page, Rockingham, Augusta, Highland, Rockbridge, Alleghany and Bath counties.

                                                                                    (END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Dec. 1, 2017