Studies
Route 3, Stevensburg to Lignum |
| Safety Assessment and Recommendations |
Project at a Glance
Begin Date
May 2009
Lengths and Limits
Stevensburg to Lignum
Locality
Culpeper
District
Culpeper
May 2009
Lengths and Limits
Stevensburg to Lignum
Locality
Culpeper
District
Culpeper
Contact
Donald Gore, Residency Administrator
540-829-7616
Safety Assessment and Supporting Documents
A safety assessment of the 4.6-mile, two-lane section of Route 3 was done by VDOT's traffic engineering group following a fatal vehicle crash in March.
The section studied runs roughly from Stevensburg to Lignum in eastern Culpeper County.
The study and its recommendations were presented during a community meeting on May 19.
Links to the study, the presentation given at the meeting, and other documents are below:
- Route 3 Safety Assessment Report (1.16 MB)
- Route 3 Safety Assessment Presentation (1 MB)
- Route 3 Speed Study (276 KB)
- Report Appendix 1, Route 3/Route 663 intersection turning movements (142 KB)
Contacts
Donald Gore, Residency Administrator, 540-829-7616Page last modified: May 20, 2009





















