Map of construction project districts

Under Construction

I-64 HRBT Ceiling Panel and Upper Duct Repairs

Project at a Glance

Begin Date
Currently Underway

Locality
Hampton

District
Hampton Roads

Contact
Hampton Roads Communications
757-925-1660

About this Project

This project involves ceiling panel and upper duct repairs in both directions of the I-64 Hampton Roads Bridge-Tunnel. 

Selected ceiling panels will be replaced including brackets, support hangers and selected adhesive anchors in the upper exhaust duct, in addition to repairing cracks and scaling on concrete walls throughout both tunnels. The ceiling panels located at the entrances and exits of both the east- and westbound tunnels will be removed and the exposed concrete will be painted. Permanent hatches will also be installed to replace the existing static ceiling panels in each of the tunnels, which will allow access into the upper air ducts for future repair and maintenance activities. 

 

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: July 25, 2017