Studies
Interstate 64 Hampton Roads Bridge-Tunnel Study (Corridor from I-664 in Hampton to I-564 in Norfolk) |
| Facilities-Hampton/Norfolk |
Area Maps
Project Photos
Project at a Glance
May 2011
Est Completion Date
May 2014
Locality
Hampton and Norfolk
Contact
VDOT Public Affairs
800-FOR-ROAD
Environmental Impact Statement (EIS)
What’s Being Done
The Virginia Department of Transportation (VDOT) and the Federal Highway Administration (FHWA) are conducting a study of the I-64 Hampton Roads Bridge Tunnel (HRBT) corridor from I-664 in Hampton to I-564 in Norfolk (approximately 11 miles).
The purpose of this study is to develop alternative solutions to address insufficient transportation capacity and correct roadway, bridge and tunnel deficiencies in the corridor. The alternatives will be evaluated using several criteria including their potential environmental impacts. The final report, an Environmental Impact Statement (EIS), will be prepared using input from the public and from various state and federal agencies, in accordance with the National Environmental Policy Act (NEPA).
Study Updates
VDOT and FHWA released the Draft EIS on December 21, 2012 for public review. The Draft EIS is now available for public and agency review and comment. All comments were due by February 13, 2012.
DEIS LOCATIONS
A full copy of the Draft EIS is available for download on this website. Copies of the Draft EIS also are available for review at several locations (PDF, 82 KB) .
Draft Environmental Impact Statement (PDF, 25 MB)
Executive Summary of Draft EIS (PDF, 906 KB)
Document Errata (PDF, 79 KB)
Technical Reports:
- Air Quality Tech Report (11 MB)
- Alternatives Tech Report (34 MB)
- Archaeological Assessment (41 MB)
- Architectural Evaluation (13 MB)
- Farmland Tech Memo (590 KB)
- Hazardous Materials Tech Memo (10 MB)
- Indirect and Cumulative Tech Memo (100 KB)
- Land Use Tech Memo (2 MB)
- Natural Resources Tech Report (12 MB)
- Noise Analysis Tech Report (43 MB)
- Parks & Recreation Tech Memo (4 MB)
- Phase I Architectural Survey Mgmt Summary (2 MB)
- Right of Way & Relocation Tech Memo (1.5 MB)
- Socioeconomics Tech Report (9 MB)
- Traffic & Transportation Tech Report (6.9 MB)
- Visual Resources Tech Memo (925 KB)
Study Schedule
Citizen Information Meeting 1 (Scoping)
Citizen Information Meeting 2 (Alternatives)
Draft Environmental Impact Statement
Location Public Hearing
Commonwealth Transportation Board Action
Final Environmental Impact Statement
May 2011
July 2011
April 2012
December 2012
January 2013
2013
2014
January 2013 Public Hearing
PDF’s
- Table of Environmental Impacts (320 KB)
- Retained Alternatives
- No Build Alternative (520 KB)
- Build 8 Alternative (470 KB)
- Build 8 Managed Alternative (172 KB)
- Build 10 Alternative (449 KB)
- Public Hearing Brochure (4 MB)
- Public Hearing Boards:
- Welcome (2.4 MB)
- No Build Alternative (858 KB)
- Build 8 Alternative (929 KB)
- Build 8 Managed Alternative (1 MB)
- Build 10 Alternative (1 MB)
- Summary (1.7 MB)
- Environmental Resources (1.6 MB)
- Project Schedule (886 KB)
- Other Projects (1.5 MB)
- Thank You (1 MB)
- Aerial Boards
April 2012 Citizen Information Meeting
PDF's 
- Meeting Handout
- Meeting Boards:
- Corridor Displays
- Frequently Asked Questions
Submit your Comments
July 2011 Citizen Information Meeting (PDFs)
- Welcome display (1.2MB)
- EIS process (1 MB)
- Environmental considerations (1.8 MB)
- Other projects (3 MB)
- Project schedule (700 KB)
- Thank you (2.3 MB)
- Transportation challenge (1.5 MB)
- Existing conditions - 1 (1 MB)
- Existing conditions - 2 (474 KB)
- Existing conditions - 3 (973 KB)
- HRBT ctizen information meeting - brochure (1.8 MB)
- Powerpoint Presentation in Windows Video n (Chrome User? Click here. )
News
- VDOT TO HOST CITIZEN INFORMATION MEETINGS FOR HAMPTON ROADS BRIDGE TUNNEL ENVIRONMENTAL IMPACT STATEMENT (July 11, 2011)