Project at a Glance

Begin Date
August 2016

Est Completion Date
Late July 2018

Cost
$60.6 million

Contractor
Corman Construction-E.V. Williams JV in association with Parsons Transportation Group

Locality
Norfolk

District
Hampton Roads

Contact
VDOT Public Affairs
757-925-1660

Project Overview

Construction of the new Military Highway Continuous Flow Intersection (CFI) will combine the addition of new lanes, new signals and new traffic management technology to increase capacity and reduce congestion along this important corridor in Norfolk.

The project will increase through-traffic capacity at Military Highway and Northampton Boulevard in Norfolk with a high-capacity intersection design.

Left-turning vehicles will be moved away from the main intersection into dedicated turn lanes, eliminating conflicts with opposing traffic.

The project also includes:

• The widening of Military Highway from a four-lane roadway to an eight-lane divided roadway from Lowery Road to Broad Creek.
• The widening of Military Highway from a four-lane roadway to a six-lane divided roadway from Broad Creek to Robin Hood Road.
• Widening Northampton Boulevard and Princess Anne Road from four-lane divided roadways to six-lane divided roadways.

Travel Impacts

Sunday night, October 8 -  Tuesday, November 21: There will be a full closure of Robin Hood Road between Military Highway and Almeda Avenue. Detours for motorists traveling east and west on Robin Hood Road will direct traffic to use Military Highway, East Princess Anne Road and Almeda Avenue.

Sunday night, November 5, October 30 - Friday, November 10: I-64 eastbound off-ramp to Military Highway (Exit 281B) will close. Detour signs will direct motorists to Exit 281A/Robin Hood Road.  

Sunday night, November 5: The entrance to Cowand Avenue from Princess Anne Road will close to through traffic for a minimum of two months, until Phase 3 is completed. Residents should follow posted detour signs to access Cowand Avenue using Kilmer Lane.

Monday night, November 6: Westbound traffic on Princess Anne Road will shift to the middle of the road onto newly widened pavement to allow construction on westbound Princess Anne. Both lanes of traffic on Northampton Boulevard will shift towards the south to allow construction in the westbound lanes of Northampton.

Saturday night, November 18
: Southbound traffic on Military Highway from the I-64 off ramp to Lewis Road will shift west onto new pavement.

Sunday night, November 19: Northbound traffic on Military Highway will shift east near the Police Academy for construction of the center portion of Military Highway.

Lane Closures

Alternating single-lane closures will be from November 1 – 30 from 9 a.m. -  3 p.m. and from 7 p.m. - 5 a.m. the following morning.

One lane will remain open at all times on:

  • Military Highway between Valley Drive and Lynn Street.
  • Princess Anne Road between Sigmon Street and Military Highway.
  • Northampton Boulevard between Military Highway and past USAA Drive.
  • Robin Hood Road between Military Highway and Miller Store Road.

What is a Continuous Flow Intersection (CFI)?

A CFI is an at-grade, high-capacity intersection design that moves left turning vehicles away from the main intersection.

Vehicles turning left will cross over through traffic and funnel into dedicated turn lanes at a signalized location several hundred feet upstream of the main intersection.

These left turning vehicles can then proceed through the main intersection at the same time as opposing through vehicles without conflict at the main intersection.

Eliminating the dedicated left turn phase improves the efficiency of the main intersection.

Intersection safety is increased by minimizing stop-and-go conditions and reducing the number of conflict points at the main intersection.

Federal studies show crash rates are reduced by almost 25 percent at intersections where a CFI has been installed.

Project Safety

The Virginia Department of Transportation, the city of Norfolk and the Corman-E.V. Williams joint venture are committed to work zone safety.

Paying close attention and avoiding distractions are key to avoiding a work zone accident.

These tips will help you safety navigate this project area:

• Follow signs: Keep an eye out for workers and signs directing you.
• Don’t tailgate: Unexpected stops may occur.
• Minimize distractions: Avoid using cell phones or adjusting radio stations.
• Don’t speed: Enhanced fines may be levied for speeding.
• Know before you go: Stay updated on project activities by calling 511 for up-to-the-minute traffic and weather information, or by visiting www.511Virginia.org.

Project Updates

To receive project updates, email Shelby Frank.

Noise Analysis Report

Final Noise Abatement Design Report (June 2016)

Sep 10, 2014, Design Public Hearing

Design Public Hearing brochure

Design Public Hearing comment form

Design Public Hearing advertisement

Jan 8, 2014, Citizen Information Meeting

Citizen Information Meeting brochure

Meeting advertisement

Citizen Information Meeting comment form

Continuous Flow Intersection (CFI)

Military Highway Traffic with Continuous Flow Intersection

VDOT: Military Highway Traffic without Continuous Flow Intersection

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: Nov. 7, 2017