Route 600 Big Bethel Road Improvements |
| Intersection Improvements (Turn lanes and bike path on Routes 134 & 171 |
Project at a Glance
Begin Date
August 11, 2006
Est Completion Date
June 30, 2007
Cost
1,084,334.12
Contractor
Curtis Contracting, Inc.
District
Hampton Roads
August 11, 2006
Est Completion Date
June 30, 2007
Cost
1,084,334.12
Contractor
Curtis Contracting, Inc.
District
Hampton Roads
Contact
David Black
757-253-5141
Features
The project will entail intersection improvements at Big Bethel Road and Magruder Boulevard. Their will be bike lanes added the entire length of the project, which is 830 meters or .5 miles. Please see the below listed turn lanes that will be added:1. Right turn lane heading north from Route 600 onto Route 134.
2. Right turn lane heading south on Rotue 600 onto Liberty Drive (1/10 of a mile south of the Big Bethel Road and Magruder Boulevard intersection.
3. Right turn lane heading south on Route 600 turning from Big Bethel Road onto Magruder Boulevard.
4. Left turn lanes on both sides of the Magruder Boulevard and Big Bethel intersection.
5. Right turn lane heading north from Big Bethel Road onto Route 171.
Contacts
David Black, 757-253-5141Lauren Hansen, 757-925-2583