Under Construction
Approaches and Bridge over Buffalo Creek |
Project at a Glance
Features
The project involves the replacement of a structurally deficient bridge with a new four-lane bridge, along with the reconstruction of the roadway approaches on both ends of the proposed structure.The limits of the proposed project begin approximately 200 feet from the west end of the existing bridge and end approximately 200 feet from the east end of the existing bridge.
The length of the project is approximately 0.1 mile.
The project was awarded to Corman Construction Incorporated on December 14, 2006.
Link to Dashboard
Dashboard project linkContacts