Project at a Glance

Begin Date
Aug. 2014

Est Completion Date
Completed Aug. 2017

Cost
$700,000

Locality
Fairfax

District
Northern Virginia

Contact
Abraham Lerner, P.E.
Special Projects
703-259-3345
Robert Iosco
Special Projects
703-259-2764

Note: The final report is now available.

About the Project

The Virginia Department of Transportation (VDOT), in cooperation with the Fairfax County Department of Transportation, conducted a multimodal corridor study for the Fairfax County and Franconia-Springfield Parkways. The Fairfax County Parkway portion of the study corridor was approximately 31 miles in length, while the Franconia-Springfield Parkway portion was 3.5 miles long. The study evaluated existing transportation issues and developed recommendations for short-term multimodal improvements that can be implemented within one to ten years. 

Resources

Public Information Meetings (Nov. 2016)

Public Information Meetings (June 2016)

Project Numbers 

State: 0286-029-167, P101
UPC: 105800

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: Aug. 22, 2017