In Design: Hunter Mill Road over Colvin Run Bridge Replacement in Fairfax County

Cost and schedule ►

Public outreach ►

This project will replace the weight-restricted one-lane Hunter Mill Road bridge over Colvin Run. The new bridge will have two lanes and four-foot-wide shoulders.

The existing bridge, built in 1974, averages 8,500 vehicles per day.

Benefits 

The project aims to reduce congestion and improve operations and safety.

Major Milestones 

First Public Information Meeting - April 2018
Second Public Information Meeting - To be determined
Design Public Hearing - To be determined
Begin Construction - To be determined

Estimated Costs
Preliminary Engineering - $800,000
Construction - $3.9 million
Total: $4.7 million

This project is being financed with federal and state funding, including State of Good Repair funds used for maintenance of structures and bridges.

Resources

Contact Info:

Vicente Valeza, P.E.
Structure & Bridge

Andrew Beacher, P.E.
Preliminary Engineering

Project Photos

Other relevant links:

Conceptual Bridge Replacement Study Report - October 2017

Previous Meetings >>

Phase: In Design

UPC: 110499, 110433

State ID: 0674-029-358, P101, R201, B643

Federal ID: STP-BR09 (295)

Lat/Long: 38.965604, -77.309634

Locality: Fairfax