Under Construction: I-66 over Route 110 and George Washington Memorial Parkway Ramps in Arlington County

Cost and schedule ►


Traffic alerts ►

This project is rehabilitating the I-66 bridge over the ramp from northbound Route 110 to westbound I-66, and the ramp from southbound George Washington Memorial Parkway to eastbound I-66/westbound Route 50. The bridge was built in 1965.

Along the bridge, I-66 averages 99,000 vehicles a day.  

Estimated Costs
Preliminary Engineering: $430,000
Construction: $5.2 million
Total: $5.7 million

This project is financed with federal and state State of Good Repair funds used for maintenance of structures and bridges.

Benefits 

This project aims to improve safety and extend the overall life of the bridge.

Major Milestones 

Begin Preliminary Engineering - February 2017
Advertise for Construction - October 2017
Award Construction Contract - January 2018
Begin Construction - April 2018
Final Completion - Mid Summer 2019

Resources

Contact Info:

Donald Angerman, CCM
Construction

Yusaf Masud, P.E.
Construction

Project Photos

Phase: Under Construction

UPC: 110500, 111781

State ID: 0066-000-491, P101, B685

Federal ID: NHPP-BR09 (296); NHPP-0661 (362)

Long/Lat: 38.893307, -77.067076

Locality: Arlington

1 / 1
July 2019
2 / 2
July 2019
3 / 3
July 2019
4 / 4
July 2019
5 / 5
Bridge facing south, pre-construction

Page last modified: July 16, 2019