I-66 Spot Improvements |
| Westbound inside the Capital Beltway, Arlington and Fairfax counties |
Project at a Glance
What's Being Done
This project is in the preliminary engineering phase and includes three spot improvements on westbound I-66 inside the Capital Beltway.These spot improvements were identified as the most congested locations during a 2004-2005 feasibility study and the subsequent 2006 traffic study.