Map of construction project districts

Coming Soon

Huguenot Bridge Reconstruction

Construction expected to begin in 2010

Project Photos

Project at a Glance

Begin Date
August 2010

Cost
Estimate $50.6 million
(includes preliminary engineering, right of way and construction)

District
Richmond

Contact
Steve McNeely, project manager
804-524-6152

What's Being Done

The bridge reconstruction project involves replacing the existing structure with a new structure in approximately the same location as the current bridge. The new structure will have one 12 foot lane and one 10 foot shoulder in each direction. The 10 foot shoulder will function as both an emergency lane and a lane to allow bicyclists to safely use the bridge. In addition, there will be a five foot wide sidewalk on each side for pedestrians. The approach roadways on each end will only be improved as necessary to accommodate the bridge replacement.

Based on the current development schedule, the project should be ready for construction by August 2010.

Subscribe to Huguenot Bridge Reconstruction e-mail updates.

Unsubscribe to Huguenot Bridge Reconstruction e-mail updates.

Why does the bridge need to be reconstructed?

Costly maintenance and repairs, the age and condition of the bridge, and the critical need for widening to allow for emergency vehicles all played a part in the decision to proceed with a reconstruction.

Features


Background

The Huguenot Memorial Bridge was constructed in 1949. It's considered a major transportation artery over the James River connecting Richmond city limits to the south and Henrico County to the north via Huguenot Road (Route 147). It carries more than 28,000 vehicles per day on average.

The bridge is one lane in each direction with a pedestrian sidewalk and no shoulders.

The bridge is inspected every 12 months and an underwater inspection is conducted every five years. In July 2007, the deck, superstructure and substructure were rated as poor. The August 2006 underwater inspection rated the footings as fair. Even with these less than optimal ratings, the bridge is structurally sound and can accommodate normal traffic.

Project Updates

VDOT held a public hearing to receive input from the community on Nov. 13, 2007.

Six Year Improvement Program

More images

Link to Dashboard

Huguenot Bridge Project

Contacts

Steve McNeely, project manager, 804-524-6152
Public Affairs, 804-524-6179
Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects

Page last modified: Nov. 2, 2009