Map of construction project districts

Proposed

Intersection Improvements at I-195 and Laburnum Ave. in Henrico

Project to improve safety and traffic flow at Laburnum and I-195 ramps

Project at a Glance

Begin Date
Late 2020

Est Completion Date
Mid-2021

Phase
Proposed

Cost
$2.4 million

Locality
Henrico

District
Richmond

Contact
Anthony Haverly
(804) 524-6000

Project Description

The primary purpose of this project is to improve traffic flow through the area during peak travel times, eliminate prolonged periods of delay and improve safety within the project limits.

Some of the major improvements proposed for this project are:

- Replace the existing intersection of Laburnum Avenue and Interstate 195 south with a roundabout.

- Construct a separate left turn lane at Interstate 195 north and Laburnum Avenue.

- Construct a single travel lane between the two intersections.

Public Involvement

A public information meeting will be held on Thursday, December 7, 2017 from 5-7 p.m. at Linwood Holton Elementary School - Gymnasium, 1600 W. Laburnum Ave., Richmond, VA 23227. A meeting brochure is available.

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: Nov. 16, 2017