Route 360 and Bell Creek Road relocation |
| Four projects to improve Route 360 in Mechanicsville |
Project at a Glance
Cost
Bell Creek Rd. relocation: $10.6 million
Rt. 360 from I-295 to Lee-Davis Rd.: $20.4 million
Lee-Davis Rd. intersection improvements: $13.5 million
Rt. 360 from Lee-Davis to Walnut Grove Rd.: $33.8 million
Locality
Hanover
District
Richmond
Bell Creek Rd. relocation: $10.6 million
Rt. 360 from I-295 to Lee-Davis Rd.: $20.4 million
Lee-Davis Rd. intersection improvements: $13.5 million
Rt. 360 from Lee-Davis to Walnut Grove Rd.: $33.8 million
Locality
Hanover
District
Richmond
Contact
Daniel Harrison, Project Manager
804-524-6398
What's Being Done
The proposed projects include more than four miles of improvements along Route 360 between the I-295 interchange and Walnut Grove Road including the relocation of Bell Creek Road.- Relocation of Bell Creek Road - The current intersection with Route 360 will be moved 650 feet to the east aligning the road with the northern section of Bell Creek Road. The completed road will consist of four through lanes, a raised median, curb and gutter.
- Route 360 between I-295 and Lee-Davis Road - In order to address congestion, VDOT proposes to increase capacity from the current three lanes in each direction to four lanes between I-295 and the proposed Bell Creek Road intersection. Three lanes would remain in each direction between the proposed Bell Creek Road intersection and Lee-Davis Road. However, a continuous through/right turn lane would be added.
- Lee-Davis Road intersection - The current intersection cannot accommodate the existing traffic and, therefore, will require additional lanes along both Lee-Davis Road and Route 360.
- Route 360 between Lee-Davis Road and Walnut Grove Road - The current two lanes in each direction would be increased to three lanes. To ensure minimal impact to businesses, residents and community resources, the road would be widened toward the median.
Project Updates
Public Hearing Transcript (5 MB) - Feb. 21, 2007PROJECT SCHEDULE:
- Relocation of Bell Creek Road:
Right of way acquisition and utility relocation = fall 2008
Construction = 2010 - Route 360 between I-295 and Lee-Davis Road:
Right of way acquisition and utility relocation = fall 2008
Construction = 2010 - Lee-Davis Road intersection:
Right of way acquisition and utility relocation = fall 2008
Construction = 2010 - Route 360 between Lee-Davis Road and Walnut Grove Road:
Right of way acquisition and utility relocation = pending funding
Construction = pending funding
Six-Year Improvement Program
Bell Creek Road relocationRoute 360 between I-295 and Lee-Davis Road
Lee-Davis Road intersection
Lee-Davis Road to Walnut Grove Road
Contacts
Daniel Harrison, Project Manager, 804-524-6398Public Affairs, 804-524-6179