Map of construction project districts

Under Construction

Augusta County - Route 610 Improvements

Area Maps

Project Photos

Project at a Glance

Begin Date
Construction Contract Awarded July 11, 2017

Est Completion Date
Fall 2018

Cost
Contract Value $2,438,619.57

Lengths and Limits
0.5 miles - from 0.1 mile south of Route 608 to 0.6 mile south of Route 608

Contractor
A.R. Coffey & Sons Inc., Buchanan, Va.

Locality
Augusta

District
Staunton

Contact
Wayne Nolde, P.E.
540-332-9047

Project Details

The purpose of this project is to improve the Route 610 (Howardsville Turnpike) corridor from 1/8 mile east of Route 608 to just east of Campbell Lane.

This 0.505-mile long project will widen the road from 22 feet to 28 feet with curb and gutter throughout. It will also improve the roadway alignment and profile to provide better visibility, and realign the intersection of Route 610 and Route 912 (Hodge Street). The project will relocate existing utilities.

Existing access to all properties in the area will be maintained during construction, and new entrances will be constructed.

The average traffic volume at this location was 2,600 vehicles per day in the year 2012. In 2024 traffic is projected to be 3,630 vehicles per day.

During the design phase, this project was esitmated to cost $4,794,091 including $786,489 for preliminary engineering, $1,000,000 for right of way acquisition and $3,007,602 for construction.

*This project was selected for funding under SMART SCALE, the new prioritization process as outlined in House Bill Two.  Click here for more information on the prioritization process.

What's Next

Design Approval - Spring 2014
Start Right of Way Acquisition - Summer 2015
Advertise for Construction - Spring 2017

Media and Public Events

"Pardon Our Dust" Citizen Information Meeting
September 26, 2017, from 4 - 6 p.m.
Stuarts Draft Rescue Squad
10 Manor Road
Stuarts Draft, Va. 24477

Public Hearing
January 15, 2014 from 4 - 7 p.m.
Stuarts Draft Rescue Squad
10 Manor Road
Stuarts Draft, Va. 24477

* Inclement weather date January 21

Benefits of Project

This project will improve visibility and stopping distance along the roadway, and enhance safety by re-aligning the intersection of Route 610 and Route 912.

During Construction

The project will be constructed using single lane closures under flagging operations during daylight hours with peak hour traffic restrictions and a limited duration detour to provide two lane operations when necessary.

Traffic Alerts

Beginning October 18, 2017, Route 610 is closed to through traffic between Route 912 (Hodge Street) and Route 660 (Lake Road) for roadway and utility work. Route 912 and Route 660 will serve as detour routes through spring 2018. Residents and school buses will have access to Route 610 with flagger traffic control.

Traffic alerts can also be found on the VDOT website under Travel Center, Travel advisories and lane closures. Click on the area of the state you are interested in, and view current travel advisories and lane closures. Click here to go to the Staunton District Travel Center page:  Staunton District

 

Real-time traffic information is available on the VDOT 511Virginia.org website and also by calling 511 on your landline or wireless phone.  Click here to go to 511:  Virginia 511 Web

Project Numbers

State   0610-007-451, P101, R201, M501

Federal   STP-007-8(118), STP-007-8(127)

UPC   80272

Project Location (latitude, longitude): 38.008611, -79.026389