Map of construction project districts

In Design

Front Royal  Happy Creek Road

Project at a Glance

Begin Date
Proposed advertisement is fall 2009.

Locality
Warren

Contact
Charlie Gardner
540-332-7893

Project Details

The project is located in the Town of Front Royal. The project extends from Sixth Street and Bradford Drive to just west of Route 606 (Shenandoah Shore Road). This portion of Happy Creek provides east and west movement into the Town of Front Royal.

The purpose of the project is to improve the existing road to meet future traffic capacity and to improve the current traffic movement in the Town of Front Royal. Happy Creek Road currently has two variable-width lanes with substandard shoulders and drainage.

The improved road is proposed to feature two 12-foot lanes with curb and gutter plus feature two four-foot bicycle lanes throughout the entire project. Right-turn and left-turn lanes are provided at Meadow Lane. New water, sewer and storm drains are also provided for the project.

There is no individual housing or commercial relocations affected by this project.

The current average daily traffic count is 5,300 vehicles. This number is projected to rise to 12,400 vehicles by the year 2028.

The Town of Front Royal is applying for revenue sharing to assist with project funding.

Media and Public Events

A public hearing was held on February 26, 2002 at the Front Royal Fire Department located at 221 North Commerce Avenue in Front Royal.

Benefits

Safety will be enhanced with wider lanes and drainage improvements, plus the relocation of all utilities. Pedestrian and bicycle access will be an additional feature.

During Construction

During construction, east and westbound traffic will be maintained at all times. Traffic will be maintained at all private entrances and connections. Flagging service will be used as necessary.

Contacts

Charlie Gardner, 540-332-7893
Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects

Page last modified: June 26, 2009