Page County - Route 340 Jeremy's Run Bridge |
Project at a Glance
Begin Date
Winter 2008
Est Completion Date
November 12, 2009
Cost
$7,674.952.55
Contractor
General Excavation Inc. of Warrenton, Va.
Locality
Page
District
Staunton
Winter 2008
Est Completion Date
November 12, 2009
Cost
$7,674.952.55
Contractor
General Excavation Inc. of Warrenton, Va.
Locality
Page
District
Staunton
Contact
Robert Good, P.E.
(540) 778-2569
Project Details
Construct the Jeremy’s Run bridge on Route 340 in Page County. This bridge will be a replacement for the current structure which is deteriorating. The new 446-foot bridge will be built next to the current Jeremy’s Run bridge. The project including the bridge and its approaches will be .65 mile long. Lanes will be 12-feet wide with four-foot paved shoulders and a 10-foot graded shoulder. A right-turn and a left-turn lane will be constructed for traffic using Route 662 (Rileyville Road) located south of the bridge. The left-turn lane will be a center lane on the bridge.